We had a chance to go by the new house today and it was an awesome experience. As you will see from the pictures, there has been fantastic progress and we can now see just how close we are to being ready to move in (currently scheduled to close on it on 2/26).
The first three pictures are the front exterior of the house, note the stone work is completed, and the brick is too, with the one exception of some work around the master bedroom windows in the back. The electricians were at the house working on the exterior lights (close-up to follow).


This is one of the 4 lights that will be across the front of the house (far left of garage, either side of the front door, and far right column).
Drew & Josh's new bathroom. Drew was very excited to get to see his new bathtub!
The cabinetry of the laundry room. The two cabinets on the left will be over the washer, with a short hanging rack over the dryer.
The tile work is completed in the entry, kitchen & bathrooms. This is the shower in the master bath.
These are our wonderful spindles on the banisters. This walkway crosses above the living room from the stairs to the boys' rooms.
Close-up of the spindles on the stairs.






1 comment:
Sure do like it. Hope to see it soon.
Mimi
Post a Comment